Edit Content

Our Gallery

Contact Info

Our Address:

Office M19, the Curve Building Al Quoz 3, Sheikh Zayed Road Dubai, UAE

Our Phone:

+971 4 2714070

5 Common Fit-Out Mistakes (And How We Avoid Them)

Whether you’re launching a new office, renovating a retail shop, or upgrading a clinic, one thing is true — your fit-out project can make or break your business momentum. 

Unfortunately, most delays, budget blowouts, and failed inspections come down to a handful of avoidable mistakes. At CBD Projects, we’ve completed over 400 commercial spaces since 2012, and we’ve seen the same issues crop up time and again — especially when projects are outsourced or rushed. 

Here are the 5 most common fit-out mistakes — and how our all-in-house team helps you avoid them from day one. 

1. Too many contractors, too little control

You hire one firm for design, another for approvals, and a third for execution — but when things go wrong, no one takes ownership. 

What happens? Miscommunication. Scope gaps. Endless finger-pointing. 

How we avoid it: At CBD Projects, we keep everything in-house — design, build, MEP, AC systems, power upgrades, and approvals. One team. Full control. Zero confusion. 

2. Starting Work Before Approvals

Some contractors begin demolition or installations while “waiting” for approvals. This may seem efficient, but it’s risky — and often illegal. 

What happens? You get hit with red tags, forced shutdowns, and costly rework. 

How we avoid it: We don’t move a muscle until all required drawings, NOCs, and authority clearances are secured. No shortcuts. No shutdowns. 

3. Underestimating Power Requirements

Your business grows, but your power supply doesn’t. Suddenly, lights flicker, machines shut down, and the whole space becomes unstable. 

What happens? Equipment damage, operational interruptions, and failure to meet DEWA requirements. 

How we avoid it: Our MEP engineers assess your kilowatt load needs in advance, handle DEWA applications, and install proper cabling, panels, and backup systems — all in-house. 

4. Poor AC System Design

A lot of fit-out companies install generic AC units with little thought to airflow, capacity, or zoning — especially in large or industrial spaces. 

What happens? Hot spots. Cold zones. Overworked units. High energy bills. 

How we avoid it: We custom-engineer your HVAC system to fit your actual usage. Especially in warehouses, clinics, and high-load areas, AC planning is not optional — it’s foundational. 

5. Lack of Communication with the Client

One of the most frustrating mistakes in any project? Being left in the dark. 

What happens? You don’t know what’s done, what’s next, or who’s responsible. 

How we avoid it: Every CBD Projects client gets a dedicated project manager, regular updates, and full visibility. We plan the work — and we work the plan, with zero surprises. 

Fit-Out Doesn’t Have to Be Stressful — If It’s Done Right

Every space is unique. Every fit-out should be too. But no matter the business type, the same principles apply: one team, one timeline, one clear scope. 

At CBD Projects, we deliver full-service fit-outs designed to meet compliance, reduce stress, and support your business goals — from approvals to power to perfection. 

Ready to Build It Right the First Time?

Let’s make your next fit-out your best one. 
Book your free consultation with CBD Projects today.